A sound design begins before the pump and nozzles are selected. First, identify where people spend time, how air moves and which elements must not come into contact with mist.
First mark where people actually sit and move.
On a restaurant terrace, mist should not be directed at plates, glassware, electronics or circulation routes. At home, timber, textiles, lighting and moisture-sensitive surfaces must also be considered.
Separate tables, walkways, the bar, entrances and unused areas on the plan. This allows zoned operation instead of running the entire terrace regardless of occupancy.
Design the zone around users, not merely around the edge of the pergola.
Check mounting points before the terrace is finished.
Pergola beams, a roof edge or part of the façade can provide orderly routing for lines and nozzles. Each point must be assessed for height, spray direction, rigidity and future inspection access.
Integration with a pergola or roof
Line routing, penetrations through structural elements and concealed utility connections can be planned in advance.
Independent mounting points
The support system must remain stable, safe and visually coherent without obstructing terrace operations.
Observe the terrace when the problem is most severe.
A morning photograph will not show how a west-facing façade heats up in the afternoon. A calm moment will not reveal gusts during peak occupancy. Record sun direction, the hottest hours and typical airflow before system selection.
- Sun exposureHours and parts of the terrace most exposed to heat.
- WindDirection of steady airflow and sudden gusts between buildings.
- HumidityConditions that affect the potential for water evaporation.
The pump and filtration require space, water, power and service access.
Technical equipment should not dominate visually, but it must remain accessible. Plan the route from the water source to filtration and the pump, the power supply, high-pressure lines and suitable protection for the equipment.
Water quality affects filtration requirements and the maintenance plan. It should be assessed before final component selection.
Design the controls for the person who will operate the system.
In hospitality, staff must respond quickly to changes in weather and occupancy. At home, a simple schedule may be the priority. In both cases, decide who operates the system, which zones work independently and what happens when conditions deteriorate.
Automation cannot correct poor nozzle geometry, but a well-designed control system can help maintain the intended operating pattern.
What should be prepared before requesting a quotation?
- 01Photographs from several angles
Show the entire area, structure, façade and a possible technical location.
- 02Approximate dimensions
Length, width, height and distances between the main elements.
- 03Functional layout
Tables, walkways, bar, entrances and zones requiring separate control.
- 04Daily conditions
The hottest hours, orientation and prevailing wind direction.
- 05Available utilities
Water, power and space for the pump, filtration and service access.