Design · installation · automation · service

A water mist system engineered for the site, not selected from a catalogue.

We engineer the complete system: water treatment, pump, zones, nozzle lines and controls. The objective may be cooling, humidity control, dust suppression or improved process conditions.

ProblemHeat, dry air, dust or process-related discomfort
Expected outcomeMicroclimate control precisely where it is needed

No performance claims are made before temperature, humidity, airflow and water quality have been assessed.

Technology flow

Seven elements. One controlled process.

Every stage affects mist quality, operating stability and future serviceability.

  1. 01Water

    Source and quality assessment.

  2. 02Filtration

    Protection for the pump and nozzles.

  3. 03Pump

    Stable operating pressure.

  4. 04Manifold

    Distribution into independent zones.

  5. 05Line

    Routing adapted to the site.

  6. 06Nozzles

    Spray direction and geometry.

  7. 07Microclimate

    A controlled outcome within the zone.

Pressure, flow rate, droplet size and the number of zones depend on the selected system and site conditions.

System objectives

One technology, different objectives.

We begin with the required outcome. Only then do we define pressure, the number of zones, nozzle type and automation.

System architecture

All components must operate as one system.

A good nozzle cannot compensate for poorly treated water, and an efficient pump cannot replace correct zone geometry.

01

Water treatment

Filtration is selected for the water quality and the requirements of the pump and nozzles.

02

Pump station

Capacity must match the number of active nozzles and the way the system is divided into zones.

03

Lines and zones

Pipe routing accounts for the structure, appearance, drainage and service access.

04

Nozzles and geometry

Spacing, direction and installation height are determined by airflow and the purpose of the zone.

05

Control

From simple switching to schedules, sensors and independent operating scenarios.

Conditions for effective operation

What do we assess before system selection?

  • temperature, humidity and natural airflow
  • space type, volume and available air exchange
  • water and power quality and availability
  • line routing and service access
  • operating time, zone layout and control method

Limitations

When is a different configuration required?

  • when humidity is high and airflow is weak
  • when surfaces must not come into contact with water
  • when water quality is unknown or filtration cannot be serviced
  • in zones exposed to strong, variable wind
  • when the required outcome has not been defined or measured

Design input

Five pieces of information are enough to begin.

  1. 01Site type

    Terrace, production hall, greenhouse, farm or another type of space.

  2. 02Dimensions and photographs

    Area, height and possible installation points.

  3. 03Problem

    Temperature, humidity, dust, odour or a process requirement.

  4. 04Utilities

    Water source, power supply and available technical space.

  5. 05Operating pattern

    Operating hours, seasonality and planned zones.

From assessment to service

The design must remain clear after commissioning.

  1. 01

    Assessment

    Objective, site conditions and input data.

  2. 02

    Design

    Zones, components, routing and controls.

  3. 03

    Installation

    Installation, adjustment and functional tests.

  4. 04

    Ongoing support

    Instructions, inspections and seasonal preparation.

View the complete project process

Frequently asked questions

What should be established before requesting a quotation?

Does a misting system wet the floor?

A correctly selected system should keep microdroplets airborne for as long as practical. Deposition risk still depends on humidity, airflow, nozzle spacing and operating time, so the configuration must be established for the specific site.

Does every system operate at the same pressure?

No. Pressure, flow rate and nozzle type are parameters of a specific solution. Selection depends on the system objective, number of nozzles, zone layout and required atomisation quality.

How often does the system require servicing?

The interval depends on water quality, operating intensity and seasonality. Essential tasks include checking filtration, nozzles, line tightness and pump parameters.

Can automation be added later?

Usually yes, provided the original design includes an appropriate zone layout, space for equipment and the option to expand the controls.

Selection begins with site conditions

Describe the site. We will outline a suitable direction.

Send dimensions, photographs, a description of the problem and information about water and power. We will return with the questions needed for an initial assessment.

Describe your site